CHAPA
Home
CHAPA Build on Your Land (BOYL) Program
Homes
Lands
Forms & Resources
Mortgage Calculator
News & Real Estate Info
FAQ’s & Education
Ads
About
Contact
Inspector Log
Inspector Log
General Information
Site Arrival Time
(Required)
Project Location
Project Name
Client
Inspector Name
Weather Conditions
Sunny
Rainy
Windy
Overcast
No. Of Men on Site
Positions
Contractor Present
Yes
No
Scope Of Inspection (Tick All That Apply)
Earthworks / Excavation
Foundation
Concrete Works
Structural Works
Masonry
Grade Beam
Roofing
Slab
Block Work
Plumbing
Electrical Rough-Ins
Plumbing Rough-Ins
Interior Plastering
Exterior Plastering
Painting
Door Installation
Window Installation
Finishes
Mill Works
External Works
Health & Safety
Environmental Controls
3. Work Activities Observed Today
Describe exactly what work was carried out. Be specific: quantities, methods.
(Required)
On site work activities
4. Inspection Findings
Works in Compliance with drawings/specification?
Yes
No
Works in compliance with approved method statements?
Yes
No
Non-Conformances Identified (If Any)
(Required)
(Brief, factual explanation of what is wrong. State what was inspected and how it fails to meet plans, standards, codes, or workmanship requirements or if none.)
Severity / Risk Level
Minor
Moderate
Major
(Tick one based on how serious the issue is.)Minor – Cosmetic or easily corrected Moderate – Affects function, quality, or compliance Major – Structural, safety-related, or requires immediate action
5. HEALTH, SAFETY & ENVIRONMENT (HSE)
PPE Compliance:
Full
Partial
Non-Compliant
Unsafe acts observed?
Yes
No
Site housekeeping condition
Good
Fair
Poor
Environmental issues
Yes
None
dust, runoff, waste, noise
6. Instructions /Corrective Actions Issued
Instruction Given
Responsible Party
Deadline
MM slash DD slash YYYY
Acknowledge
Yes
No
7. Delays, Risks & Liabilities Identified
Identify any issues that may cause cost overruns, delays, rework, or legal exposure.
Potential Cost Impact:
None
Low
Medium
High
Potential Programme Impact:
None
Low
Medium
High
8. PhotoGraphic Record
Photos taken today ?
Yes
No
(Minimum requirement: wide shot + close-up for each critical activity or issue)
Photo Reference numbers/ Upload Location (Hive or Other)
Post Image
Accepted file types: jpg, jpeg, png, gif.
9. Follow-Up Required
Follow-Up inspection required?
Yes
No
Items to be Rechecked?
Date of Follow-up:
MM slash DD slash YYYY
10. Inspector Declaration
I confirm that this inspection was carried out personally, and the information recorded above is accurate, complete, and truthful.
Date
MM slash DD slash YYYY